{"stringID":null,"fieldNames":["SMID","SMUSERID","SMLENGTH","SMTOPOERROR","SMGEOMETRY","GJ","ID","NAME","DESC_","PIPE_ID","END_LINE","OPERATOR","START_LINE","DESIGN_DEPT","CONSTER_DEPT","TRUNKDIVISION_NUMBER","TYPE","RISK_LEVEL"],"geometry":{"center":{"x":1.17578922711E7,"y":3432216.384300001},"parts":[10],"style":null,"prjCoordSys":null,"id":13,"type":"LINE","partTopo":null,"points":[{"x":1.17584488244E7,"y":3432407.309500001},{"x":1.17584943713E7,"y":3432438.086099997},{"x":1.17584224525E7,"y":3432437.659699999},{"x":1.17583226822E7,"y":3432395.957599998},{"x":1.17580685519E7,"y":3432242.1844},{"x":1.17578922711E7,"y":3432216.384300001},{"x":1.1757750881E7,"y":3432088.2108},{"x":1.17574160737E7,"y":3432084.406099998},{"x":1.17573103675E7,"y":3432140.582199998},{"x":1.17572221172E7,"y":3432136.3693}]},"fieldValues":["13","0","1443.9417726188992","0","","DN1.5","7","黄金坡分干线","黄金坡前池-黄金坡水厂","24","黄金坡水厂","西部水资源开发有限公司","黄金坡前池","华东院","总包九分部（水电九局）","4","0",""],"ID":13}