{"stringID":null,"fieldNames":["SMID","SMX","SMY","SMLIBTILEID","SMUSERID","SMGEOMETRYSIZE","SMGEOPOSITION","施工方","洞径_管","纬度","经度","起止桩","长度","隧洞名","高程"],"geometry":{"center":{"x":120.68875708217365,"y":27.903981572191867},"parts":[1],"style":null,"prjCoordSys":null,"id":9,"type":"POINT","partTopo":null,"points":[{"x":120.68875708217365,"y":27.903981572191867}]},"fieldValues":["9","120.68875708217365","27.903981572191867","1","0","20","32928","钻爆法施工","城门洞型，衬后4.6m×4.8m（局部钢衬间","27.9039815722","120.688757082","SC0+000.000~ SC4+660.029","4.7km","山茶隧洞","117.66"],"ID":9}