{"stringID":null,"fieldNames":["SMID","SMX","SMY","SMLIBTILEID","SMUSERID","SMGEOMETRYSIZE","SMGEOPOSITION","隧洞名","长度","起止桩号","施工方式","洞径_管径","经度","纬度"],"geometry":{"center":{"x":120.68875708217365,"y":27.903981572191867},"parts":[1],"style":null,"prjCoordSys":null,"id":9,"type":"POINT","partTopo":null,"points":[{"x":120.68875708217365,"y":27.903981572191867}]},"fieldValues":["9","120.68875708217365","27.903981572191867","1","0","20","160","山茶隧洞","4.7km","SC0+000.000~ SC4+660.029","钻爆法施工","城门洞型，衬后4.6m×4.8m（局部钢衬间","120.68875708217365","27.903981572191867"],"ID":9}