{"stringID":null,"fieldNames":["SMID","SMX","SMY","SMLIBTILEID","SMUSERID","SMGEOMETRYSIZE","SMGEOPOSITION","隧洞名","长度","起止桩号","施工方式","洞径_管径","经度","纬度"],"geometry":null,"fieldValues":["3","120.47660388366239","28.04993093186704","1","0","20","40","藤泽隧洞","3.1km","TZ0+000.000~ TZ3+131.639","钻爆法施工","城门洞型，衬后6.4m×6.4m","120.47660388366239","28.04993093186704"],"ID":3}